Partnership in order to investigate the contamination of the soil and groundwater in the environmental audit conducted for Renault Technologie Roumanie SRL on the Titu-Boteni site
The location of this project was the Titu Research Center, part of Renault Technologie Romania (RTR), which was to be built in order to test vehicles and components in various phases of the project.
Drilling works have been carried out during this project, the investigated site was hydrogeologically characterized, samples of soil and ground water were taken and analyzed in the laboratory.